Route 68 Ultra 100 km 2027: felt heat and shade along the course

Route 68 Ultra 100 km 2027: 98 km and 3,620 m of climbing, on 16 January 2027. Cut-off: 18 h.

For this race, SHADE (shaderoutes.com) computes the real shade along the official course (trees, terrain, buildings) and the felt temperature, in degrees, at every checkpoint, at the time you will be there at your own pace. While the race is more than two weeks away, the weather used is the ten-year normal for the same date (ERA5 reanalysis): it is not a forecast. Free, no account.

Checkpoints

CheckpointkmAltitude (m)Difference due to altitude, vs. the start
Start (Dewan Serbaguna Orang Asli, Gombak)01260 °C
Telco Tower9.8408−2 °C
Genting Sempah16.2567−3 °C
Bukit Tinggi Junction24.6311−1 °C
Bentong Hotspring34.51270 °C
Waterway Villa (turnaround)41.41170 °C
Bentong Hotspring (return, 9 h cut-off)48.31430 °C
Bukit Tinggi Junction (return)58.1363−2 °C
Janda Baik T-Junction63463−2 °C
Kampung Janda Baik70.9423−2 °C
Janda Baik T-Junction (return)75.8502−2 °C
Genting Sempah (return)82.2567−3 °C
Telco Tower (return)88.7408−2 °C
Finish (Dewan)98.51260 °C

Altitude alone: about 6.5 °C cooler per 1,000 m. Shade, sun, wind and humidity are added by SHADE.

Official race website · Version française · SHADE: loops in the shade · All races · Method · Run in the shade, city by city